SC 63x50
Airtac
0049
Aluminium
63mm
50mm
Double acting
Air (to be filtered by 40 μm filter element)
0.1~1.0MPa(15~145psi)(1.0~10.0bar)
1.5MPa(215psi)(15bar)
-20~80℃
30~800
3/8"
Bore size(mm) | 32 | 40 | 50 | 63 | 80 | 100 | |
Acting type | Double acting | ||||||
Fluid | Air (to be filtered by 40 um filter element) | ||||||
Mounting type | SC | Basic FA FB CA CB CR LB TC FTC TCM1 | |||||
SCD SCJ | Basic FA LB TC TCM1 | ||||||
Operating pressure | 0.1~1.0MPa(15~145psi)(1.0~10.0bar) | ||||||
Proof pressure | 1.5MPa(215psi)(15bar) | ||||||
Temperature °c | -20~80 | ||||||
Speed range mm/s | 30~800 | ||||||
Cushion type | Variable cushion | ||||||
Adjustable cushion stroke mm | 21 | 28 | 29 | ||||
Port size | 1/8" | 1/4" | 3/8" | 1/2" |
Our product features | Our Services Guarantee: |
1) Competitive price | 1) Prompt respond (Reply with 24 hours) |
2) Good quality | 2) Free Samples (Customer pay for the delivery cost) |
3) Professional Packaging | 3) Registration support. |
4) Produce according to Customers’ instruction | 4) Photos/videos are available during production. |
5) None delay shipment | 5) Loading inspection, and send loading photos before shipment. |
Bore size(mm) | 32 | 40 | 50 | 63 | 80 | 100 | |
Acting type | Double acting | ||||||
Fluid | Air (to be filtered by 40 um filter element) | ||||||
Mounting type | SC | Basic FA FB CA CB CR LB TC FTC TCM1 | |||||
SCD SCJ | Basic FA LB TC TCM1 | ||||||
Operating pressure | 0.1~1.0MPa(15~145psi)(1.0~10.0bar) | ||||||
Proof pressure | 1.5MPa(215psi)(15bar) | ||||||
Temperature °c | -20~80 | ||||||
Speed range mm/s | 30~800 | ||||||
Cushion type | Variable cushion | ||||||
Adjustable cushion stroke mm | 21 | 28 | 29 | ||||
Port size | 1/8" | 1/4" | 3/8" | 1/2" |
Our product features | Our Services Guarantee: |
1) Competitive price | 1) Prompt respond (Reply with 24 hours) |
2) Good quality | 2) Free Samples (Customer pay for the delivery cost) |
3) Professional Packaging | 3) Registration support. |
4) Produce according to Customers’ instruction | 4) Photos/videos are available during production. |
5) None delay shipment | 5) Loading inspection, and send loading photos before shipment. |